Skip to content
Book a consultation
Success stories

Success stories from Malaysia and Asia Pacific

Real projects from manufacturers, energy companies, hospitals, schools and public agencies. See what each client needed, what we delivered and what changed.

500+
Projects delivered
150+
Clients
26+
Years of experience
15+
Countries served
Fiix CMMS projects

Maintenance and asset management

Plants, hospitals, schools, terminals and data centers that moved maintenance off spreadsheets and onto Fiix.

Analog Devices SEA (Philippines)

Semiconductors · Philippines · Fiix

The challenge. A high-precision assembly and test site needed one system for hundreds of machines across several factories, including calibration and compliance checks.

What we did. We implemented Fiix to digitize work orders, automate preventive maintenance with checklists, keep audit-ready calibration records and give department heads their own reports.

The result. Full traceability on every work order, live asset histories and continuous tracking of MTBF, MTTR and availability, ready for ISO and internal audits.

Starken AAC Sdn Bhd

Manufacturing · Malaysia · Fiix

The challenge. Maintenance for ball mills, agitators, cutting systems and hydraulics was tracked in spreadsheets, with requests in a separate database.

What we did. We moved the team onto Fiix for work orders, preventive and calibration plans, work requests and spare parts in one system.

The result. Instant access to asset and parts history, cost per asset, MTBF and MTTR tracking, and parts consumption trends that cut inventory waste.

Aiman Foods & Beverages Company

Food and beverage · Fiix

The challenge. Tetra lines, pasteurizers and homogenizers needed planned maintenance and breakdown tracking in a system the team would actually use.

What we did. We implemented Fiix with maintenance schedules for each production asset, real-time breakdown tracking and equipment health views.

The result. Exact asset locations and maintenance costs per machine, and pending work orders that are easy to follow up.

Alliance Construction Materials Ltd

Construction materials · Fiix

The challenge. Concrete mixers, conveyors, gear reducers and motors needed a usable CMMS for maintenance planning and asset records.

What we did. We introduced Fiix with maintenance schedules, breakdown tracking and equipment health views for the production plants.

The result. Complete asset records with locations and maintenance costs, and work orders that are completed on schedule.

Atria Data Center

Data centers · Indonesia · Fiix

The challenge. Daily checks, inspections and monthly maintenance for critical facility equipment were tracked by hand.

What we did. We implemented Fiix so the team creates and closes work orders without paper and runs scheduled maintenance from one system.

The result. Full asset and parts history, easy follow-up on pending work and dashboard insight for the facilities team.

Texwipe Asia (Philippines)

Manufacturing · Philippines · Fiix

The challenge. Calibration, downtime and spare parts were tracked in Excel, with work requests in an online database.

What we did. We implemented Fiix for paperless work orders, preventive maintenance and work requests in one place, with asset and parts records.

The result. Maintenance cost per asset, preventive maintenance history and managers who can see pending work at a glance.

Farmland Bakery (M) Sdn Bhd

Food manufacturing · Malaysia · Fiix

The challenge. Proofers, packing machines and other bakery equipment needed scheduled maintenance and asset records.

What we did. We introduced Fiix with maintenance schedules for every bakery machine, breakdown tracking and equipment health.

The result. Asset locations and maintenance costs on record, and work orders tracked through to completion.

Central Luzon Doctors’ Hospital

Healthcare · Philippines · Fiix

The challenge. Medical equipment and building facilities needed tracking, planned maintenance and spare parts control.

What we did. We implemented Fiix for medical devices and facility equipment, with breakdown tracking and spare parts inventory.

The result. Assets and parts organized by location, maintenance costs per asset and dashboards for faster decisions.

IKEA Supply (M) Sdn Bhd

Manufacturing · Malaysia · Fiix

The challenge. Pumps, generators and other M&E equipment needed asset management, maintenance scheduling and inventory control.

What we did. We implemented Fiix with schedules for all equipment, breakdown and work order history, and live inventory levels.

The result. Asset and parts records by location, cost per asset and clear tracking of pending work orders.

Tyson Foods Malaysia

Food manufacturing · Malaysia · Fiix

The challenge. Food processing machinery history and spare parts levels needed to be tracked online.

What we did. We implemented Fiix with maintenance schedules, work order history, equipment health and spare parts tracking.

The result. Machine history and maintenance cost per asset in one place, with dashboards for the maintenance team.

Integrated Container Terminal Sdn Bhd

Logistics · Malaysia · Fiix

The challenge. A fleet of forklifts and heavy vehicles needed meter-based maintenance and spare parts control.

What we did. We implemented Fiix with meter readings, scheduled maintenance, breakdown tracking and parts inventory.

The result. Maintenance cost per vehicle and supervisors who can track pending work orders at any time.

OMS Group Sdn Bhd

IT assets · Malaysia · Fiix

The challenge. The IT team needed to register and track every device, handle service requests and manage inventory.

What we did. We implemented Fiix as an IT asset register with owners, specifications, updates and charge departments.

The result. A clear view of each device and its condition, faster allocation for new staff and performance reports.

Indo Pusaka Berau

Industrial · Indonesia · Fiix

The challenge. The team needed asset records, maintenance planning, preventive and corrective maintenance and inventory tracking.

What we did. We implemented Fiix to give the team asset and parts information and to monitor equipment health and maintenance.

The result. Maintenance cost per asset on record and supervisors who can follow up pending work orders.

GEMS International School Tropicana Metropark

Education · Malaysia · Fiix

The challenge. The maintenance team needed a system to monitor and maintain the school’s facilities.

What we did. We implemented Fiix to plan and track facility maintenance across the campus.

The result. Weekly checks for the pool, firefighting systems, generator, chilled water, lighting and landscaping are tracked with ease.

M-Files projects

Document management

Engineering, manufacturing and energy teams that brought documents, numbering and approvals into M-Files.

Meinhardt EPCM Sdn Bhd

Engineering · Malaysia · M-Files

The challenge. Project deliverables, transmittals, procurement records and design documents needed one cloud repository with automated approvals.

What we did. We deployed M-Files Cloud with metadata-driven filing and automated workflows for transmittals, deliverables and procurement.

The result. Faster reviews and approvals, remote collaboration across project teams and a single source of truth that is ready for audit.

Mutiara Etnik Sdn Bhd

Engineering · Malaysia · M-Files

The challenge. Project deliverables and transmittals needed a central repository with automatic document numbering.

What we did. We implemented M-Files with controlled numbering for transmittals, deliverables and revisions, plus fast search.

The result. Document controllers find files in less time, and users access documents by permission with clear revision status.

SPIE Oil & Gas Services (Thailand) Limited

Oil and gas · Thailand · M-Files

The challenge. Engineering deliverables, technical queries and transmittals needed a central repository with automatic numbering.

What we did. We implemented M-Files with controlled numbering for transmittals, deliverables, technical queries and revisions.

The result. Faster document retrieval for the controller and easy tracking of status, revisions and transmittals.

INEOS PCG Acetyls Sdn Bhd (enhancement)

Petrochemicals · Malaysia · M-Files

The challenge. INEOS wanted to extend M-Files with improved workflows, updated templates and better metadata for Management of Change documents.

What we did. We reworked the workflows to match the new business process and added custom scripting for steps not available out of the box.

The result. Templates and workflows that stay current, with every document stored, findable and accessible to the right people.

PHN Industry Sdn Bhd

Manufacturing · Malaysia · M-Files

The challenge. Physical documents had to move into a central digital repository with automatic numbering.

What we did. We implemented M-Files as the controlled document system, with workflows that complete every approval digitally.

The result. Documents stored in one place, easy to find and share, with less duplication and rework.

Carpeton Industries Sdn Bhd (phase 1)

Construction · Malaysia · M-Files

The challenge. The contracts and commercial team needed one repository running tender, project registration and purchase order workflows.

What we did. We implemented M-Files with automatic numbering for purchase orders, requisitions, projects and tenders.

The result. Less paper, faster retrieval and clear status tracking for tenders, projects and workflows.

Carpeton Industries Sdn Bhd (phase 2)

Construction · Malaysia · M-Files

The challenge. Project, design, HSE and ISO documents needed to link to the project codes created in phase 1.

What we did. We extended M-Files to digitize the full workflow cycle with automatic numbering for drawings and ISO documents.

The result. No missing documents between departments and quick, permission-based access to project and ISO records.

Tanjung Offshore Services Sdn Bhd

Oil and gas · Malaysia · M-Files

The challenge. The Bayan project and QHSE documents needed a controlled repository with automatic numbering.

What we did. We implemented M-Files with controlled numbering for transmittals, drawings, project documents and vendor packages.

The result. Faster retrieval of transmitted documents and easy tracking of drawing status and package numbers.

INEOS PCG Acetyls Sdn Bhd (phase 1)

Petrochemicals · Malaysia · M-Files

The challenge. E-appraisal and integrated management system documents needed a central, controlled repository.

What we did. We implemented M-Files with automated routine workflows for e-appraisal and IMS documents.

The result. Documents stored centrally, always on the latest template and accessible to the right people.

INEOS PCG Acetyls Sdn Bhd (phase 2)

Petrochemicals · Malaysia · M-Files

The challenge. Paper-based Management of Change forms covered every change from proposal to commissioning and slowed approvals.

What we did. We digitized the MOC forms in M-Files with workflows, status tracking and an automatic audit trail.

The result. Shorter approval times, full visibility of each MOC and controlled access to the information behind it.

Johnson Pump (M) Sdn Bhd

Manufacturing · Malaysia · M-Files

The challenge. An existing M-Files system needed to match daily work, support remote access and simplify ISO audits.

What we did. We digitized paper forms, set up company-wide templates and classified documents so related information links together.

The result. A repository that is accessible from anywhere, with automatic document history that supports ISO audits.

Vinda Malaysia Sdn Bhd

Manufacturing · Malaysia · M-Files

The challenge. ISO documents needed a central repository under the control of the document controller.

What we did. We implemented M-Files with automated routine workflows for the ISO documentation.

The result. Quality documents stored in one governed place, easy to find and share, with less rework.

Tianqi Lithium Australia

Mining · Australia · M-Files

The challenge. Project documents and vendor information needed a controlled repository managed by the document controller.

What we did. We implemented M-Files with automated workflows and seamless Microsoft Office integration.

The result. Documents stored centrally and easy to track, with better information sharing across the project.

KASI Malaysia

Engineering · Malaysia · M-Files

The challenge. A large volume of engineering documents needed to be digitized and indexed in a corporate repository.

What we did. We implemented M-Files and indexed the engineering documents for browser access.

The result. Content and collaboration in one place, with offline access and automatic sync for traveling users.

BC Petroleum / Roc Oil

Oil and gas · Malaysia · M-Files

The challenge. Existing document control had gaps, and legacy documents needed to move into a software-based system.

What we did. We implemented M-Files as a central information management system with automated workflows.

The result. Documents that are easy to manage, find and track, with less redundancy and rework.

Where it started

Engineering document control

Since 1999 we have delivered document control for oil and gas, power, aviation and the public sector across Asia Pacific.

M3NERGY Berhad

Oil and gas · Malaysia

The challenge. Engineering and QA/QC documents needed transmittal management and online markup.

What we did. We implemented a document management system with transmittals and online markup and commenting.

The result. Reviews, approvals and drawing markups completed online, including from remote locations.

PETRONAS Carigali Sdn Bhd

Oil and gas · Malaysia

The challenge. Large volumes of operating and maintenance manuals, drawings and vendor manuals needed to be digitized and indexed.

What we did. We developed the Electronic Document Access System (EDAS) and populated it using templates and procedures built for PETRONAS.

The result. Remote users across operating regions can access the documents, improving collaboration and productivity.

PETRONAS Penapisan Melaka Sdn Bhd

Refining · Malaysia

The challenge. An online Management of Change system was needed to meet process safety requirements.

What we did. We replaced the paper MOC with an online system that tracks every change approval form, with search and email alerts.

The result. Every change request is traceable, with notifications for the required approvals.

PETRONAS Ammonia Sdn Bhd

Petrochemicals · Malaysia

The challenge. An operational improvement initiative called for paperless operations and better information sharing.

What we did. We added knowledge and records management to the existing document system, plus workflows for the maintenance bad actor program.

The result. Better collaboration and business process management across the organization.

PETRONAS Carigali Myanmar

Oil and gas · Myanmar

The challenge. The document management system needed to be available in a disaster recovery environment.

What we did. We reinstalled and customized the system for the disaster recovery site.

The result. The complete document management system can be recovered when needed.

Murphy Sabah Oil Corporation Ltd

Oil and gas · Malaysia

The challenge. Drawing-related documents needed to be monitored, retrieved and answered quickly.

What we did. We implemented an enterprise document system with integrated drawings, markups and transmittal workflows.

The result. Review cycles cut from seven days to three, with no more hard copy drawings or outdated references.

Murphy Sarawak Oil Corporation Ltd

Oil and gas · Malaysia

The challenge. Vendor documents and transmittals needed central monitoring and control.

What we did. We implemented content lifecycle and transmittal management for vendor documents and drawings.

The result. Review cycles cut from seven days to three, with documents and drawings centrally controlled.

Daewoo International Corporation

Oil and gas · Myanmar

The challenge. Design and engineering of the Shwe, Shwe Phyu and Mya gas facilities had to be fast-tracked.

What we did. We delivered a turnkey content lifecycle solution with transmittals, CAD markup and approval, and bulk loading of engineering data.

The result. Seamless information exchange between partners, contractors and regulators kept the project on schedule.

Premier Oil Far East Ltd

Oil and gas · Asia Pacific

The challenge. A global content lifecycle system needed local support with oil and gas process knowledge.

What we did. We ran system health checks and optimization, and trained administrators and end users.

The result. Faster searches, quicker uploads of engineering data and more capable users.

Asia Pulp & Paper Co Ltd

Pulp and paper · Asia Pacific

The challenge. Document management had to integrate about 200 GB of data from SAP, Lotus Notes and FoxPro.

What we did. We implemented a content lifecycle system with data integration from the existing applications.

The result. Users kept working in familiar systems without learning a complicated new process.

Talisman Energy

Oil and gas · Malaysia

The challenge. FPSO maintenance and inspection under a performance contract needed integrated document management.

What we did. We implemented a regulated document system linked to the maintenance and inspection management systems.

The result. Faster, more accurate document handling across procurement, inspection, safety, operations and maintenance.

Malaysia-China Hydro Joint Venture

Power · Malaysia

The challenge. Document controllers needed to be the focal point for all document submissions.

What we did. We implemented a document management system with automatic notifications on document updates.

The result. Controlled submissions and inboxes free of document email traffic.

Malaysia Airports Berhad (KLIA)

Aviation · Malaysia

The challenge. Facility drawings, datasheets, maintenance procedures and inspection records needed a robust engineering document system.

What we did. We delivered a turnkey solution of hardware, software and services for staff, contractors and suppliers.

The result. Wider access to critical maintenance and inspection procedures, with better security and data integrity.

Alstom Power Asia Pacific

Power · Asia Pacific

The challenge. Documents held in Lotus Notes needed a proper content management system.

What we did. We migrated the documents with a translation table so every file stays retrievable by its old definition.

The result. Users index, search and share documents without learning a complicated new program.

Kebabangan Petroleum Operating Company (KPOC)

Oil and gas · Malaysia

The challenge. Project teams in several remote locations needed shared documents and complex engineering workflows.

What we did. We delivered a turnkey system with transmittals and online Management of Change in one repository, plus long-term support.

The result. Better collaboration across locations, faster submissions and drawing markups completed online.

Royal Malaysian Police, Special Branch Division

Public sector · Malaysia

The challenge. Evidence in audio, video, photo and written formats needed a robust records system.

What we did. We delivered a turnkey records management solution for every evidence format in each case.

The result. Fast, complete record retrieval that helps identify repeat offenders, with collaboration across locations.

Sime Darby Group of Companies

Engineering and construction · Malaysia

The challenge. Major oil and gas projects needed the right information in the right place to finish on schedule.

What we did. We implemented an engineering document system with content lifecycle, transmittals, bulk loading and drawing markup.

The result. Lower distribution costs, tighter document control and contractors who upload and download documents directly.

Consulting projects

Safety, compliance and asset data

Safety reports, environmental plans and asset data projects for energy, water, healthcare and public sector clients in Malaysia.

Pengurusan Air Selangor (Labohan Dagang plant)

Water treatment · Malaysia

The challenge. The Occupational Safety and Health (Control of Industrial Major Accident Hazards) Regulations 1996 require a CIMAH safety report, and the Labohan Dagang water treatment plant needed a new one.

What we did. We prepared the report, covering the safety management system for operations and maintenance, the safety engineering standards, the major hazards for site personnel and the public, and the emergency response plan and public safety leaflets.

The result. A documented self-examination of safe operation, effective systems for major hazard assessment and risk management, a manual for running the plant safely, and compliance with the CIMAH regulations.

Pengurusan Air Selangor (Sg Labu plant)

Water treatment · Malaysia

The challenge. The CIMAH regulations require the safety report to be updated within three years of the last one, so the Sg Labu water treatment plant needed an update.

What we did. We updated the previous CIMAH safety report, reviewing the safety management system, the safety engineering standards, the major hazards for site personnel and the public, and the emergency response plan.

The result. Better awareness of the potential for a major accident, clearer measures for controlling it, and a plant that stays in compliance with the CIMAH regulations.

SPCI Hartakimia (CIMAH)

Safety and compliance · Malaysia

The challenge. Hartakimia's CIMAH safety report was due for its three-year update under the 1996 regulations.

What we did. We updated the report to describe the activity at the facility, the type, likelihood and consequences of possible major accidents, and the arrangements for safe operation, control of serious deviations and emergency procedures.

The result. One report covering every hazardous substance and its quantity, the installation, the management system and the risk assessment of potential major accidents.

SPCI (chemical health risk assessment)

Safety and compliance · Malaysia

The challenge. The Occupational Safety and Health (Use and Standards of Exposure of Chemicals Hazardous to Health) Regulations 2000 required a chemical health risk assessment.

What we did. We identified the hazard of each chemical used, evaluated worker exposure by inhalation, skin contact and ingestion, checked the existing controls and recommended further controls and priority actions.

The result. Clear decisions on control measures, worker induction and training, and whether exposure monitoring and medical surveillance programs are needed.

AsPac Lubricants (M) Sdn Bhd (environmental management plan)

Lubricants · Malaysia

The challenge. Project Kancil needed an environmental management plan to meet the Environmental Quality Act 1974 during construction and facility operation.

What we did. We wrote the plan as a control framework: continuing legal compliance, action plans to reduce the impacts identified in the environmental impact assessments, team roles and responsibilities, and a monitoring, audit and performance review program.

The result. A single document that shows the mitigation measures are working, that all approval conditions are met and that emission and discharge standards are being met.

AsPac Lubricants (M) Sdn Bhd (written notification)

Lubricants · Malaysia

The challenge. Written notifications for two oil separators had to be submitted to the Department of Environment under the Environmental Quality (Industrial Effluent) Regulations 2009.

What we did. We gathered and compiled the operating, water supply and consumption, effluent treatment, laboratory, sludge and monitoring information for the oil separators.

The result. Effluent discharge that stays within limits, a self-check of the treatment system, and a notification that satisfies the approval conditions.

Sapura Kencana Petroleum

Oil and gas · Malaysia

The challenge. A new facility needed asset data built from scratch: an asset register, a risk matrix and integrity critical element register, performance standards, maintenance plans and bills of material.

What we did. A site team built the asset hierarchy with the client, ran the integrity critical element workshop, developed performance standards and compiled maintenance plans, task lists and spares data to the client's SAP master data standards.

The result. A complete, approved set of asset and maintenance data ready to load into the maintenance system.

HESS

Oil and gas

The challenge. An effective maintenance system needed high-quality asset data captured and analyzed before it could be loaded.

What we did. We used our asset data capture tool to build and check the asset register, risk matrix, performance standards, maintenance plans and bills of material.

The result. Error-free data in a format ready to upload to the maintenance system.

PETRONAS Gas Berhad

Oil and gas · Malaysia

The challenge. The facilities had to stay safe and reliable for the next twenty years, with obsolete equipment replaced and equipment master data updated to match management of change requirements.

What we did. A site team updated the equipment and plant asset hierarchy in the SAP maintenance master data, linked spare parts to the lowest level and extended plant-level materials to the right equipment.

The result. Clean asset data for the maintenance system, joined-up operations and maintenance teams, and a clearer path to more uptime.

Lundin Petroleum BV Malaysia

Oil and gas · Malaysia

The challenge. The Bertam facilities needed a fast, low-cost way to verify assets and spare parts before loading data into the maintenance system.

What we did. We introduced TagMan, a field tool for asset verification that synchronizes data online for integrity checks and quality control before upload.

The result. Fast searching, data capture and barcode scanning, with photos and GPS data stored against each tag, and use in restricted areas with no internet connection.

Petrofac Corporation

Oil and gas · Malaysia

The challenge. Petrofac wanted a supply chain audit of its Malaysian operations to find areas for improvement, based on ISO 55000 and Petrofac and PETRONAS codes and standards.

What we did. We completed a gap assessment of the supply chain and built a roadmap, with each opportunity ranked on added value, cost and ease of implementation.

The result. Many improvements could start immediately. The biggest gains were in spare parts holding, warehousing, maintenance system optimization and maintenance procedures.

Kebabangan Petroleum Operating Company (KPOC)

Oil and gas · Malaysia

The challenge. KPOC schedules preventive and routine maintenance inside SAP with drag and drop, and asked for the MAC report to show a custom LAFD field that reflects risk and work type at work order creation.

What we did. We added the LAFD field to the MAC report screen and pulled its value from the order master data.

The result. A fuller MAC report for data-driven decisions, real-time updates between the tool and SAP, and fewer information silos between departments.

Jabatan Kerja Raya (JKR)

Public sector · Malaysia

The challenge. Users and contractors needed one system to inspect and maintain the FPSO facilities under a performance service contract.

What we did. We delivered a regulated document management system linked to Maximo and Credo, so documents can be retrieved across procurement, inspection, safety, operations and maintenance.

The result. Faster, more accurate document management for the maintenance and inspection unit and across the organization.

IHH Healthcare Berhad

Healthcare · Malaysia

The challenge. As part of a procure-to-payment digital transformation across all operations, IHH wanted to improve its accounts payable process.

What we did. An integrated team delivered an invoice automation solution in six months. Invoices from every hospital and clinic go to one folder, where they are captured and matched against purchase orders and goods received notes. We have supported and enhanced it since go-live.

The result. Lower processing cost, no hard copy storage, fewer errors and less manual matching, with better transparency, quality control and faster payment.

Could your team be the next story?

Tell us what you are working on and we will show you how similar organizations solved it.