Client’s Requirement:
· Asset Register & Equipment Lists
a. Creating asset register inclusive but not limited to P&IDs, non-P&ID items, ex-equipment register, lifting equipment register, special tools & testing equipment list.
b. Validate and update the asset register master
· Develop the Risk Matrix & Integrity Critical Element (ICE) Register.
· Develop Performance standards for equipment/asset with appropriate pass/fail criteria where it is applicable.
· Develop maintenance Plans, Items, Task Lists, Task List Operations and where required, materials required for task.
· Preparation of Material master for catalogued items.
· Develop BOM (Bill of Material) in accordance with required method
EDMS-K2 provided a team on site using our proprietary tools and methodologies to:
· The hierarchy was developed and grouped using engineering code and system
· philosophy in liaison and approval from the SKHL. This was approach was later
· altered based on the commissioning marked-up P&IDs and client specific requirements.
· The ICE assessment workshop was completed and the review focus safety system, environmental and production.
· Performance Standard for assets with ICE rating A to D was then developed upon
· completion of the ICE register and with appropriate client approval.
· Maintenance data was compiled in the form of plan, items and task lists with
· respect to SAP/PM Master Standards document.
· K2 compiled project specific spares & BoM data and submitted a template based on similar project knowledge and experience, for client to use as required.
Benefits & ROI:
· Utilized ADAM software to provide the advanced data capture and analysis required for the development of an effective EAM (CMMS) system, ensuring high-quality, error-free data in a format suitable for upload to SAP.